SSOUTHWEST ASPHALTSEALING & STRIPING LLC
Serving Southwest Wisconsin

A fresh finish.
A lasting first
impression.

Bring your asphalt back into focus. Sealing, striping, crack filling, hot mix and cold mix patching, and new asphalt coming in 2027 for driveways and parking lots across Southwest Wisconsin.

CLEAN LINES. FRESH PERSPECTIVE.
ASPHALT & STRIPING / DESIGN ILLUSTRATION
DRIVEWAYS & PARKING LOTSSOUTHWEST WI • LET’S GET TO WORK ↗
What we do

Good pavement.
Better curb appeal.

From the driveway to the parking lot, start with a conversation about your surface and what it needs.

01 / PROTECT & REFRESH

Asphalt sealing

We use polymer-modified sealcoat for asphalt driveways and parking lots. Polymer modifiers enhance the coating’s performance, including flexibility and resistance to wear, with specific properties depending on the product formulation.

Sealcoating adds a protective wearing layer and refreshes the appearance of weathered pavement. Surface preparation, application conditions, and proper drying time all play a part in the finished result.

Cleaning before sealcoating
A clean surface gives sealcoat a suitable foundation to bond to. Preparation includes removing loose dirt, sand, gravel, leaves, and other debris by sweeping, blowing, or other appropriate cleaning methods. Grass and weeds along edges or growing through cracks need to be addressed so they do not interfere with treatment.

Oil, grease, and other contamination require particular attention. Affected areas may need a compatible cleaner and, where the sealcoat manufacturer specifies, an oil-spot primer. Cleaning cannot restore asphalt that has softened or deteriorated from contamination; damaged material may need repair.

If washing is needed, the pavement must be allowed to dry to the sealcoat manufacturer’s requirements before application. Loose pavement and failed areas should be assessed, and crack repairs coordinated with the coating work. Painting over dirt or sealing a damp, unsuitable surface can interfere with adhesion and the finished result.

Cracks and damaged areas are considered separately before coating. Sealcoat does not replace missing asphalt or repair a failing pavement base; we can discuss crack filling and patching as part of your project.

Discuss asphalt sealing ↗
02 / DEFINE & ORGANIZE

Parking lot striping

Clear markings. An organized property.
Fresh striping defines parking spaces, clarifies traffic lanes, and gives your property a well-maintained appearance. We can discuss refreshing existing lines or the marking needs of your parking area, including spaces, directional markings, and designated zones.

We use Sherwin-Williams Pro-Park™
Pro-Park™ is a premium waterborne acrylic alkyd traffic-marking paint made for parking areas at shopping centers, recreation facilities, offices, and apartment communities. Sherwin-Williams describes its chemical and dirt resistance and strong adhesion to properly prepared concrete and asphalt surfaces. It is designed for visible parking-lot markings, refreshed traffic lanes, and improved curb appeal.

Preparation and layout
Before painting, the surface condition, existing markings, and proposed layout need to be reviewed. Dirt, loose material, and other contamination must be addressed so paint can bond properly. When striping follows new asphalt or sealcoating, the surface must be ready for paint under the applicable product instructions.

Details that suit your lot
Discuss your parking spaces, traffic flow, curb markings, and any stencil or designated-area needs with us when requesting a quote. Confirming the layout, dimensions, and colors before application helps keep the finished markings consistent with your project requirements.

Drying and reopening
Weather, surface conditions, and paint application affect drying time. We’ll explain when the marked area can reopen to traffic. Routine wear varies with traffic volume, turning movements, and pavement condition; periodic restriping helps keep markings visible.

Learn about Sherwin-Williams Pro-Park™ ↗

Discuss your striping project ↗
03 / ADDRESS THE CRACKS

Crack filling

We use hot-applied crack sealant meeting ASTM D6690 Type II. The material is heated for application into properly prepared pavement cracks, helping limit water entry beneath the asphalt.

Cleaning before crack filling
Cracks need more than a quick pass over the pavement. Loose aggregate, dust, dirt, vegetation, and failed filler that would prevent bonding must be removed from the opening. Suitable methods may include mechanical cleaning and compressed air, with equipment and technique selected for the crack and sealant being used.

The crack faces must be clean and dry as required by the sealant manufacturer. Standing water and trapped moisture can interfere with bonding and hot-applied sealant installation. When appropriate, specialized hot-air equipment can help dry and clean cracks; overheating or scorching the surrounding asphalt must be avoided.

Routing or reshaping is considered only where appropriate for the pavement, crack condition, and specified repair method. Once preparation is complete, sealant should be installed before debris or moisture recontaminates the opening, following the product’s heating and application instructions.

Why preparation matters
Proper cleaning helps the sealant contact the crack faces rather than loose dirt or old, unsound material. It supports adhesion and helps the repair limit water entry. Preparation cannot correct a failing pavement base or turn widespread, severely broken asphalt into a sound surface.

Type II identifies a performance category within ASTM D6690 for hot-applied joint and crack sealants. The standard evaluates properties including consistency, softening point, bond performance, resilience after heat aging, and compatibility with asphalt. These requirements address how the material performs, rather than describing a numbered quality grade.

The sealant is designed to remain flexible as pavement cracks move with changing temperatures. Crack condition, preparation, and correct application matter to the repair. Widespread cracking or a failing base may still require patching or replacement.

About the ASTM D6690 standard ↗

Discuss crack filling ↗
04 / REPAIR DAMAGED AREAS

Hot mix patching

What is hot mix patching?
Hot mix patching repairs localized pavement damage using a heated blend of stone aggregate and asphalt binder. The material is placed and compacted while hot to form a dense patch in an existing driveway or parking lot.

Preparing the damaged area
The repair starts with assessing the pothole or failed pavement. Depending on the damage, preparation may include cutting back to sound pavement, removing loose or deteriorated asphalt, and cleaning the repair area. If the base beneath the pavement is soft or unstable, it needs attention before new asphalt is placed.

Placing the asphalt
The prepared area receives hot mix at a suitable working temperature. A tack coat may be used where specified to help bond the repair to existing pavement. The asphalt is spread to the required depth, with deeper repairs placed in appropriate layers so each layer can be compacted effectively.

Compaction and finish
A roller or plate compactor consolidates the mix before it cools. Proper compaction reduces air voids and helps the patch support traffic. The finished repair should meet the surrounding surface as closely as practical, with attention to transitions and drainage.

When hot mix is a good option
Hot mix is commonly used for durable repairs to potholes, broken pavement edges, and other localized failures when the surrounding pavement is serviceable. Work depends on suitable weather, access, and hot mix availability.

After the repair
The patch needs to cool sufficiently before traffic returns. We’ll explain when you can drive or park on it and any precautions for turning tires, heavy loads, or later sealcoating. A new patch may differ in color and texture from older pavement, and its performance depends on the base, drainage, preparation, and traffic conditions. Widespread pavement failure may require a larger repair or replacement.

Discuss hot mix patching ↗
05 / PATCH & MAINTAIN

Cold mix patching

What is cold mix patching?
Cold mix is a blend of stone aggregate and asphalt binder formulated to remain workable without the high application temperatures required by hot mix. It is used to fill potholes and repair localized damage in existing asphalt driveways and parking lots.

How the repair is made
The damaged area is assessed, and loose pavement, debris, and excess water are removed as required by the material’s instructions. The patching mix is placed into the prepared hole and compacted to seat the material firmly against the surrounding pavement. Deeper repairs may require placement and compaction in layers.

When cold mix is useful
Cold mix is often a practical option for smaller potholes, urgent maintenance, and repairs when hot mix is unavailable. Some formulations are suitable for cold or damp conditions; the specific product and site conditions determine when it can be applied.

Compaction and reopening
Thorough compaction helps reduce voids and movement in the patch. Curing and readiness for traffic depend on the product, repair depth, weather, and traffic load. We’ll explain the instructions for your repair, including any restrictions on turning, parking, or sealing over the patched area.

What to expect
Cold mix can provide an interim repair, and its service life varies with preparation, material selection, drainage, and the condition of the pavement beneath it. A patch fills a damaged area; it does not correct a weak base or widespread pavement failure. Larger or recurring problem areas may call for hot mix patching or replacement.

Discuss cold mix patching ↗
06 / BUILD A FRESH SURFACE

New asphalt — coming in 2027

New for 2027: we’re expanding into new asphalt with the DraggTec asphalt drag-box paving system. Planning a driveway or parking area? Contact us to discuss your 2027 project.

How the DraggTec system works
The drag box is pulled by a skid steer or truck as asphalt is supplied to it. Its screed spreads and levels the material into a controlled layer, helping establish a consistent surface before final compaction.

Adaptable to the project
We can place asphalt from 1 to 6 inches thick, with the appropriate thickness determined by your project and site conditions. DraggTec offers paving widths from 8 to 12 feet. Divider options allow narrower strips for patching and other confined work. The system can be used for driveways, pathways, parking areas, and pavement repairs, depending on site access and project requirements.

What makes a finished pavement
Spreading asphalt is one stage of installation. Base preparation, drainage, suitable material thickness, and final compaction are also essential. We’ll discuss the site conditions and scope before planning your new asphalt work.

Explore the DraggTec paving system ↗

Discuss new asphalt ↗
Your next steps

From first call
to fresh asphalt.

Tell us what you have in mind.
We’ll help you work out the next step.

01

Tell us about your project

Call or email with your location, the service you need, and a few details about the surface.

02

Discuss the details

We’ll discuss the scope, surface conditions, and information needed to prepare your quote.

03

Plan the work

Confirm scheduling, preparation, and when you can use the surface again before work begins.

See our work

Real projects.
Fresh results.

Visit Southwest Asphalt Sealing & Striping LLC on Facebook to browse our project photos and follow our latest updates.

See our project photos on Facebook ↗
Before we get started

A few common questions.

How should I care for my pavement after sealcoating?

Keep traffic off while the coating cures
Our aftercare guide recommends waiting at least 24–48 hours before walking on the surface and 48–72 hours before driving or parking. Cooler temperatures, shade, humidity, and limited airflow may require more time. Follow the project-specific reopening instructions we give you.

Prevent tire marks and concentrated loads
Avoid sharp turns, hard braking, and rapid acceleration for the first 30 days. Keep heavy equipment, motorcycle kickstands, trailer jacks, and other concentrated loads off the surface for at least 7 days. Alternate parking positions during the first 14 days to help reduce uneven wear.

Keep the surface clean
Sweep away debris gently. Address oil, fuel, fertilizer, and chemical spills promptly using cleaning methods compatible with the coating. The guide recommends mild soap and water; ask us before using strong cleaners or pressure washing on a fresh surface.

Water and weather
Avoid standing water, sprinklers, pressure washing, and heavy runoff during the first 48 hours. Confirm any watering or cooling instructions with us before wetting the coating, and follow the sealcoat manufacturer’s requirements.

Winter and ongoing maintenance
Ask us which traction materials and de-icers are suitable for your coating before use. Sweep regularly, address vehicle leaks and new cracks, and inspect the coating for wear. Our guide suggests considering resealing every 3–4 years; the actual need depends on traffic, exposure, and pavement condition.

Open the sealcoating aftercare guide ↗

Download the PDF · Questions? Call 608-348-7325

What should I know about asphalt sealcoating?

What sealcoating does
Sealcoating applies a protective surface coating over existing asphalt. It refreshes faded pavement and provides a wearing layer that helps protect the underlying surface from exposure and everyday wear. It is maintenance for pavement that is still structurally sound, rather than a replacement for asphalt repairs.

Our polymer-modified sealcoat
We use polymer-modified sealcoat. Polymer modifiers are included to enhance coating performance, such as flexibility and wear resistance, depending on the formulation. The material must be mixed, applied, and allowed to dry according to its manufacturer’s instructions.

Evaluating your asphalt first
Before coating, the pavement should be checked for loose material, potholes, cracking, drainage problems, and areas weakened by oil or other contamination. Crack filling and patching may be needed before sealcoating. New asphalt also needs time to become suitable for coating; timing depends on its condition and the sealer manufacturer’s guidance.

Cleaning and preparation
Dirt, dust, sand, leaves, and loose debris need to be removed so the coating can contact sound pavement. Edges and vegetation need attention, and oil spots may require compatible cleaning or a manufacturer-specified primer. If the pavement is washed, it must dry adequately before coating. Sealcoat cannot bond reliably to loose contamination or repair asphalt that has deteriorated beneath a stain.

Application and coverage
The coating is applied at the coverage rate and under the conditions specified for the product. The application method, number of coats, and any approved additives should suit the surface and project requirements. More material is not automatically better: excessive thickness can delay drying and affect performance. Edges, transitions, and adjoining surfaces require care during application.

Weather and curing
Air and pavement temperature, humidity, shade, airflow, and the forecast all affect scheduling and drying. The coating needs a suitable weather window and protection from rain while it develops. A surface that looks dry may still need more time before vehicle use. We’ll provide instructions for reopening your driveway or lot based on your project.

Care after sealcoating
Follow the recommended waiting time before walking, driving, or parking on the coating. Early sharp turns, stationary tire twisting, heavy loads, and concentrated pressure can mark a fresh surface. Keep the pavement clear of debris and address fluid leaks promptly. Ask us when striping or other follow-up work can take place.

Planning future maintenance
How often pavement needs another coat depends on traffic, weather exposure, drainage, and the condition of the existing coating. Inspect for wear rather than applying extra coats on a fixed schedule regardless of condition. Address new cracks and localized damage as part of ongoing maintenance.

Where do you work?

Southwest Asphalt Sealing & Striping LLC serves Southwest Wisconsin. Contact us with the property address or nearest town so we can confirm service at your location and discuss access to the site.

Let us know whether the project is a residential driveway, commercial parking lot, apartment property, or another paved area. Include any access restrictions, narrow entrances, gates, or business hours that may affect a visit or the work.

Call 608-348-7325 or email southwestsealing26@gmail.com with your location and the service you need.

What should I include when requesting a quote?

Start with your name, a contact number, the project address, and the service you are interested in: sealcoating, crack filling, striping, hot mix patching, cold mix patching, or new asphalt coming in 2027. If you are unsure what the pavement needs, describe the problem you want to address.

Approximate length and width or total square footage are helpful if available. Send wide-angle photos of the whole area and close-up photos of cracks, potholes, pavement edges, oil spots, and places where water collects. For striping, include the existing layout and any proposed changes.

Tell us about your preferred timing, how the area is used, and any requirements for keeping entrances, parking spaces, or business access available. Photos help start the conversation; some conditions and measurements may need to be reviewed on site before the scope and quote can be confirmed.

Email details and photos to southwestsealing26@gmail.com, or call 608-348-7325 to discuss your project.

How soon can I drive on the surface?

The reopening time depends on the service, materials, and site conditions. We’ll provide instructions for your project before you resume walking, driving, or parking on the treated area. A surface that looks ready may still need additional drying, cooling, or curing time.

After sealcoating: temperature, humidity, shade, airflow, and coating thickness affect drying. Keep vehicles off until the specified waiting period has passed, and follow guidance about parked vehicles and sharp turns on the fresh coating.

After hot mix patching or new asphalt: the asphalt must cool sufficiently before traffic returns. Heavy loads, stationary tire turning, and concentrated pressure can mark a fresh surface. Ask about any restrictions for your vehicle type and use.

After cold mix patching or crack filling: reopening depends on the specific material, depth of repair, weather, and traffic. Follow the instructions for the product installed rather than assuming it has the same waiting time as another repair.

After striping: allow the paint to dry sufficiently before traffic crosses the markings. Weather and pavement conditions influence readiness. If conditions change or you are unsure, call us before reopening the area.

Can sealing fix damaged asphalt?

Sealcoating maintains the surface of asphalt that is otherwise sound. It adds a protective wearing layer and refreshes its appearance, but it does not rebuild a weakened base, replace missing pavement, or level depressions where water collects.

Individual cracks: crack filling may be appropriate depending on their size, movement, and condition. We use hot-applied ASTM D6690 Type II crack sealant. The cracks need suitable preparation before the material is installed.

Potholes and localized damage: hot mix or cold mix patches may be appropriate. Hot mix is placed and compacted while hot; cold mix is formulated for placement without those high temperatures and is often useful for smaller or interim repairs. The choice depends on the site, season, material availability, and repair needs.

Widespread failure: extensively broken pavement, recurring potholes, soft areas, or persistent drainage problems may require more substantial repair or replacement. New asphalt is coming to our services in 2027.

Send photos of the whole surface and close-ups of damaged areas so we can discuss the next step. Cleaning, patching, and crack treatment should be considered before coating; covering damage with sealer alone does not correct its cause.

Let’s get started

Your next fresh start
is a phone call away.

608-348-7325 ↗

Serving Southwest Wisconsin

Have a project in mind?

Email us your location, the service you need, and a few photos. We’ll use those details to start the conversation about your quote.

Request a quote by email ↗

Opens your email app with a project outline ready to fill in.